Construction Budget & Draw Process

Download the Pimlico construction budget template, learn how to delineate your scope line-by-line, and see why our 48-hour draw turnarounds keep rehabs on schedule — not stuck on hold.

24 hrsAvg. draw turnaround
$0Draw-inspection fees surprises
~4 freeDraws per project, then a flat fee
The Template

A budget your lender & GC can both work from.

Every deal we fund starts with a written scope and line-item budget. We built this template so you can hand the same document to your lender, your general contractor, and your insurance inspector — and everyone reads it the same way. Nothing proprietary. No locked cells. Yours to edit and reuse.

  • 25 pre-built rehab line items covering the CSI divisions we see on 80% of fix-and-flip deals — demo, framing, HVAC, plumbing, electrical, kitchens, baths, flooring, paint, exterior, landscape, permits.
  • Draw-schedule builder that groups line items into milestones and calculates the % complete and draw amount at each stage.
  • 10% contingency row auto-calculated on total hard costs, which matches how we underwrite your loan.
  • Change-order log so cost overruns get documented in one place — not scattered across text threads.
  • Contractor sign-off block that your GC signs at each draw, so everyone stays honest about what's actually complete.
Why a written budget matters

Our underwriters can approve a loan 4–6 days faster when a real line-item budget comes in with the file — instead of a back-of-napkin rehab number. Your draws also clear faster because we know exactly what was supposed to be done at each stage.

Download the Template

Free Excel workbook. No signup, no email required.

XLSX
Pimlico Construction Budget.xlsx Excel · 10 KB · v2026.01
↓ Download Template

Works in Excel, Numbers, and Google Sheets. Last updated Jan 2026.

What's Included

  • Line-item budget tab
  • Draw schedule & milestones
  • Change-order log
  • Contractor sign-off block
  • One-page deal summary
Our Draw Process

Fast draws, no runaround.

Slow draws kill rehab margins. Labor walks, materials prices move, carry costs stack up. We built our draw process to stay out of your way.

1

48-hour turnaround

From the moment you submit a draw request with photos and invoices, we target 48 hours to inspection order, review, and fund. Most draws clear in under 2 business days.

2

Virtual inspections

For most draws, we accept geo-tagged photos and a short video walk — no scheduling a third-party inspector, no waiting days for a window. Complex draws still get an on-site visit.

3

First few draws on us

Most projects include around four free draws. After that, additional draws carry a small flat fee — always disclosed up front, never a surprise on your closing statement.

4

Real humans, not a portal bot

Every draw is reviewed by a named person on our construction team. If we have a question, we call you — we don't reject your submission and leave you hunting for what was missing.

5

No holdbacks on paid work

If work is done and documented, we fund it. We don't hold back 10% at every draw to create a slush fund. You get paid what the work is worth.

6

Direct-to-GC ACH

On request, we'll wire or ACH draws directly to your general contractor — keeping your personal accounts out of the flow and preventing the "I paid my GC but they didn't credit me" mess.

MG
Your Point of Contact

Mitch Gross

Construction & Project Manager

Mitch oversees every draw from scope review through funding. Have a question on a rehab budget, a draw request, or an inspection? Call him directly — same team, every project, every draw.

(410) 504-7075 mitch@pimlicogroup.com
How a Draw Works

From request to funded, in four steps.

1

Submit the Draw

In your borrower portal: upload photos, invoices, and a short note about what's complete. Takes 10 minutes.

2

Virtual Review

Our construction team reviews your submission same-day or next-day. If anything's unclear, we call or text you.

3

Inspection (if needed)

Virtual-first for most draws. On-site for major milestones or new borrowers. We schedule in 24 hours.

4

Funds Released

ACH or wire to you or directly to your GC. Most borrowers see money in the account the same day we approve.

The Difference

Pimlico vs. the typical hard-money draw process.

If you've done a few rehabs, you've probably felt every row in the left-hand column. Here's what we do differently.

 Typical LenderPimlico Capital
Draw turnaround5–10 business days~24 hours
Inspection methodThird-party only, on-siteVirtual-first; on-site when warranted
Draws per projectCapped at 3–5~4 free, then a flat fee per draw
Per-draw fees$350–$750 eachModest flat fee after the first few, disclosed upfront
Holdback policy10% of each draw held backWe fund work that's complete — no sandbagging
Who reviews drawsPortal queue, rotating staffNamed point of contact, same team every time
When questions come upEmail chain, 2–3 day delaysDirect phone call, same day
Common Questions

FAQ

Do I have to use your template?
Not if you have your own. We accept any line-item budget that includes scope, quantities, unit costs, and a draw schedule. The template is a shortcut, not a requirement.
What counts as a valid draw request?
Three things: (1) photos or video showing the work is complete, (2) paid or pending invoices from your contractor, and (3) a brief note describing what was done against which budget line items. That's it.
Can my general contractor submit draws instead of me?
Yes. Many of our repeat borrowers set up their GC with portal access so the GC submits directly. You still approve the release before funds move.
What if a draw request gets rejected?
We don't really "reject" — if something's missing or unclear, we call you and work it out the same day. Outright rejections are rare and usually involve scope that was never in the original budget.
How do change orders work?
Log the change in the template's change-order tab, send it to us, and we confirm whether the additional scope can be funded from contingency or requires a loan-modification. Response within 48 hours.
Is there an inspection fee?
Yes — third-party inspections run $150–$225 depending on market and are passed through at cost. Virtual inspections have no additional fee. All inspection costs are disclosed in your closing documents upfront.
Can I draw on materials before they're installed?
No — we fund work that's already complete. Submit a draw once the scope is finished and verifiable on-site (or by photo / video for a virtual inspection). This keeps holdbacks minimal and protects you from paying for materials that never get installed or that get damaged before they do.

Got a deal with a rehab scope?

Grab the template, fill out your budget, and get a rate quote from Pimlico — all without a credit pull.